Maximum permitted gross combination weight
Stowage areaAssembly overview - impact bar
1 -
Impact bar
2 -
Guide bracket
Left and right
3 -
Hexagon nut
Qty. 2 on each side
2.0 Nm
4 -
Bolt
Qty. 2 on each side
8 Nm
5 -
Bolt ...
Assembly overview - toothed belt, engine codes CPTA, CHPA, CZEA, CZDA
1 -
Toothed belt
Before removing, mark direction of rotation with chalk or
felt-tipped marker pen.
Check for wear
Removing
→ Chapter
Installing (adjusting valve timing), CPTA, CZEA
& ...
General repair notes
Before starting work on the fuel supply system, the
following steps must be performed:
Before starting work, the extraction hose of a switched-on
exhaust gas extraction system must be laid near to the assembly
opening of the fuel t ...