VW Golf manuals

Volkswagen Golf Service & Repair Manual: 1-pack anti-corrosion primer

Designation:
1-pack anti-corrosion primer -LLS MAX 003 M2-, red brown
Issued 03.2013
Product description
The 1-pack anti-corrosion primer -LLS MAX 003 M2- is a zinc chromate-free single-pack product from the PVB system.
The product can be used as a wash primer on all commonly found metallic substrates.
Protective garments and equipment in accordance with work safety regulations must be worn.
Properties:
Good corrosion protection.
Easy to handle (one-pack product).
Technical data sheet
Substrate
Suitable substrates:
Bare sheet steel, sanded
Cleaned and sanded electroplated or roller-galvanised steel panels or soft aluminium
Well-sanded factory paint or old paint (with the exception of thermoplastic paint)
Genuine replacement part primer, sanded
Surfaces prepared with 2-pack polyester products and then finely sanded
  Note
Owing to the wide variety of metal alloys and manufacturing processes, it is essential to carry out a preliminary test on the respective substrate to ensure that the pretreatment is sufficient to guarantee perfect adhesion.
   
Substrate pre-treatment:
–  Thoroughly clean with silicone remover -LVM 020 000 A5- or slow-drying silicone remover -LVM 020 100 A5-.
 

1-pack anti-corrosion primer

–  Lightly sand old or factory paintwork.
–  Completely remove any rust spots and sand feather edges to old paint.
 

1-pack anti-corrosion primer

–  Before recoating, use a suitable cleaning agent to ensure a clean surface free of residues.
 

1-pack anti-corrosion primer

Application
Application:
–  Vigorously shake can for at least 2 minutes.
 

1-pack anti-corrosion primer

Method of application: “spray”.
–  Apply in 2 spray passes with 5-10 minutes intermediate flash-off time.
Spraying distance:
–  Maintain a distance of 20-25 cm.
–  The specified thickness for the dry film is 15-20 µm.
  Note
If spray work must be interrupted, ensure that the nozzle is cleared to avoid clogging by inverting the can and spraying until the valve is empty.
 

1-pack anti-corrosion primer

Drying
Flash-off time is 10 to 20 minutes at an ambient temperature of +20 °C.
 

1-pack anti-corrosion primer

Recoating
Recoat with:
2-pack HS surfacer (see relevant data sheet)
2-pack HS top coats
Waterborne base coat and 2-pack HS clear coat
  Note
Do not recoat with polyester or epoxy products.
Do not use on thermoplastic paint.
Do not overpaint directly with waterborne base coat.
  Caution
Protective garments and equipment in accordance with work safety regulations must be worn.
Observe safety information sheets as well as warnings on the label of the spray can.
Shake again briefly before spraying each coat.
After fully emptying the spray can, dispose of as recycling material
Data
 

1-pack anti-corrosion primer

VOC content: 2004/42/IIB(e)(840)690 The EU limit value for this product (product category IIB.b) in ready-to-spray form is max. 840 g/l of volatile organic compounds. The VOC content of this product in ready-to-spray form is max. 690 g/l.
 
     
Storage
The guaranteed shelf life is 60 months from date of production. May be used until the date stated on the label at latest if stored in sealed original containers at +20 °C.
 

1-pack anti-corrosion primer

SprayMax System
...

1-pack test paint
Designation: 1-pack test paint -LLS MAX 005-, black Issued 10.2008 Product description ...

Other materials:

Assembly overview - cover and padding for seat pan, seat depth adjustment
1 -  Seat pan Assembly overview → Chapter. 2 -  Seat padding For seat depth adjustment Allocation → Electronic Parts Catalogue Removing and installing seat cover with seat padding → Chapt ...

Assembly overview - evaporator housing
  Note There are different designs and makes of heater and air conditioning unit. The individual components of the various heaters and air conditioning units are similar but not identical. The combined fitting of different makes of component ...

Running-in
First read and observe the introductory information and safety warnings Please follow the regulations concerning running-in new parts. Running in a new engine Any new engine has to be run in during the first 1,500 kilometres. During its first few hours of running, the internal friction in ...

© 2016-2024 Copyright www.vwgolf.org