Look carrierSeparating control unit from hydraulic unit
Special tools and workshop equipment
required
ESD workplace -VAS 6613-
Torx bit T25
If a control unit is defective, separate it from the
hydraulic unit and renew only the control ...
Assembly overview - fuel tank, vehicles with fuel tank leak detection
1 -
Cap
Screw in until engages audibly
Secured to tank flap unit by means of retaining strap.
2 -
Earth connection
For fuel filler neck
3 -
Bolt
Renew ...
Coolant specification
First read and observe the introductory information
and safety warnings The cooling system is filled at the factory with a mixture
of specially prepared water and at least 40% coolant additive G 13
(TL-VW 774 J). The coolant additive is dyed purple. This mixture of water and coolant
additi ...