Service and disposal of belt tensioners
IntroductionChecklist
The following actions must always be carried out in the given order
in preparation for changing the wheel :
In the event of a flat tyre, park your
vehicle on a firm and level surface at a safe distance from the flow of traffic.
Switch on the electronic parking brake
Braking, st ...
Bleeding hydraulic system following standard procedure
Note
Bleeding the hydraulic system using brake filling and
bleeding equipment -VAS 5234- is described.
A pre-pressure of 2 bar is required for bleeding the ABS
hydraulic unit -N55-.
Specia ...
Removing and installing guide plate
Special tools and workshop equipment
required
Removing
Torque wrench -V.A.G 1783-
Note
The guide rails and the securing b ...