Operating the speed limiter
IntroductionOverview - power transmission
Overview - power transmission - front-wheel drive
The 7-speed dual clutch gearbox 0CW equipped with 5 shafts. 2 input
shafts and 3 output shafts.
A1 -
Input shaft 1
A2 -
Input shaft 2
B1 - ...
Removing and installing spring, multi-link suspension, left spring for
front-wheel drive, left and right spring for four-wheel drive
Special tools and workshop equipment
required
Spring compressor -V.A.G 1752/1-
Spring retainer -V.A.G 1752/3A-
...
Removing and installing electronics box (E-box)
Removing
–
With ignition switched off, disconnect earth cable from
battery
→ Chapter.
Diesel engine
–
Remove engine control unit and lay to one side with
...